Diagnose Before Selecting Work
Check the plumbing, tank, outlet, equipment and field as needed. A recurring backup should not automatically produce the same pump-out recommendation. Find the cause and explain the proposed scope.
Consider Parts and Structural Condition
Accessible fittings or controls may be replaceable when the surrounding system is suitable. Major leakage or deteriorated walls need broader assessment. No patch suits every damaged shell.
Use the Lee Repair Application
The failing-system packet includes the existing-system/repair evaluation, site plan, original permit date and water-use records unless served by a well. DOH-Lee determines the application and design requirements for the actual scope.
Check Whether Engineering Is Required
All new applications in unincorporated Lee need an engineer, but repairs have their own triggers. Larger, altered engineered or special treatment systems can need signed and sealed plans. Confirm with the office rather than applying one threshold to every project.
Keep the Approval and Follow-Up
Do not start permit-required construction before approval. Complete required inspections and retain the repair record. Document any remaining field, capacity or advanced-treatment issue that still needs work.